CLIENT:
Synlait Milk Factory
Contract Period:
July 2019 – July 2021
CONTRACT VALUE:
2.5M
Synlait Project Traction – New Railsiding
This project involved creating a new rail track alongside the existing main track so that cargo trains could be diverted into the Synlait factory.
This project involved :
HARDSTAND AREA
Built alongside the track for loading and unloading. Scope of works included clearing existing trees, erosion control, relocating an existing bund, creating a nardstand base-course and installing associated stormwater drainage.
RAILSIDING CIVIL WORKS
Bulk earthworks in KiwiRail land.
Rail siding base-course prepared.
Stormwater line and drainage installed. SW Culvert installed
Compacted ballast laydown along new railway
Construction of rail access gravel road
RAIL PEDESTRIAN TACKS
- KiwiRail installed the railway line itself in May, and GHC began work to construct a pedestrian track between the old and new railway lines.